Rough, final and touch-up cleaning

Post-Construction Cleaning
Services in Toronto

Licensed and insured · $5M liability coverage · WSIB-covered crews · Available 24/7 for project enquiries

The trades are done. The site still isn’t ready for a walkthrough. Fine dust sits inside cabinets and window tracks. Protective film remains on glass. New floors show every footprint. Profound Cleaning handles rough, final and touch-up cleaning for Toronto new builds, commercial fit-outs, condos and renovations. We agree on the scope before work starts and provide a completion log after each booked phase.

  • Written Scope Before Work
  • Completion Log Every Phase
  • Quotes in 24 Hours
  • WSIB-Covered Crews
WSIB Certified & $5M Insured
Written Scope Before Work
Completion Log Every Phase
Crews On-Site in 48-72h
Background-Checked Staff
Homes and Businesses

Professional Post-Construction Cleaning for Toronto Homes and Businesses

A newly finished space needs more than routine cleaning. Construction dust can settle on every horizontal surface, while adhesive, paint spots, grout haze and packaging need different methods and tools. Cleaning too early can mean paying to clean the same surfaces again after the trades return.

We clean sites for general contractors, developers, property managers, business owners and homeowners. That includes new condo units, office and retail fit-outs, industrial spaces and smaller renovation projects. A single renovated suite may need one final clean. A larger build may need rough, final and touch-up visits scheduled around the trade sequence.

The written scope tells you what each visit covers. It also identifies work that needs separate assessment, so you know what you’re approving before a crew arrives.

See what’s included
Post construction cleaning Toronto crew removing dust from a new build
WSIB-Covered CrewsClearance for site access
✓ Written
Scope
Profound Cleaning crew on a post-construction project
Detail cleaning during a final clean phase
WSIBCovered
30+
Buildings Monthly
Why Profound Cleaning

Why Choose Profound Cleaning for a Toronto Construction Clean?

A written scope before the first visit.

We identify the areas, surfaces, cleaning phases and site requirements in the quote. You can see what is included and what needs separate pricing.

A record after each booked phase.

Our completion log notes the areas cleaned and any deficiencies observed during the work. Your project team has a document to review during handover rather than relying on a verbal update.

Crews prepared for active-site requirements.

Profound Cleaning is licensed and carries $5 million in liability coverage. Our crews have WSIB coverage, and insurance documents and current clearance can be provided for site access. Staff are background-checked and follow the building’s sign-in and PPE rules.

Scheduling around the handover.

We review the trade schedule, building access and target date before booking the clean. Written quotes are returned within 24 hours once we have enough information to assess the job. Crew mobilization is typically possible within 48-72 hours of an accepted quote, subject to site access and availability.

Profound Cleaning also services more than 30 commercial buildings each month. See examples of that work on our Our Work page.

Request a Written Quote
Full Scope

What Our Post-Construction Cleaning Services Include

Every project starts with an assessment. These are the tasks we can include where they apply to the site; your written scope confirms the exact work.

Fine Dust and Surface Detailing

Construction dust reaches ledges, door frames, baseboards, window tracks, shelving, closets and cabinet interiors. Our crew details the accessible surfaces included in the scope, working from higher areas down to the floors.

Accessible vent covers, grilles and registers can be cleaned. Work inside HVAC ductwork is a separate duct-cleaning service.

Interior Glass, Floors and Fixtures

We clean applicable interior windows, glass doors, partitions, mirrors, frames and hardware. Protective film, labels, adhesive and paint spots are assessed by surface before removal. New and coated glass needs the right method; aggressive scraping can cause damage.

Floor work depends on the material and its condition. The scope may include vacuuming, mopping, machine scrubbing or grout-haze removal. Stripping, sealing, polishing and restoration are assessed separately through our commercial floor cleaning service. Exterior or hard-to-access glass may require a separate commercial window cleaning scope.

Kitchens, washrooms, appliances and newly installed fixtures can also be detailed for handover.

Debris and Disposal

We clear loose debris, packaging and coverings from the areas included in the clean, then stage them under the site’s disposal plan. Off-site hauling, demolition waste and large-volume bin removal should be discussed during the quote. They aren’t automatically included in a final clean.

We can flag scratched glass, damaged surfaces or unfinished trade work in the completion log. Repairs and hazardous-material abatement belong to the appropriate trades.

How It Works

Our Post-Construction Cleaning Process

Site details and photos sent for a post-construction quote
Step 01

Tell Us About the Site

Send the location, approximate square footage, type of project, current trade status and handover date. Photos or plans help us understand the work. For larger or more complex sites, we arrange a walkthrough and review loading, elevator and work-hour rules.

Written scope and quote for a construction clean
Step 02

Receive a Written Scope and Quote

We identify the cleaning phases the project needs, the areas covered and work that requires separate pricing. You receive a written quote within 24 hours once the site has been assessed.

Crew completing a final clean phase
Step 03

Schedule the Right Cleaning Phases

  • Rough clean: After major construction work, while the site is still progressing. We clear initial debris and dust so finishing work can continue.
  • Final clean: After dust-producing trades have finished. This is the detailed clean of the agreed surfaces, glass, fixtures, cabinets and floors.
  • Touch-up: Close to PDI, opening or occupancy. We address dust that has resettled and marks left by later trade visits.
Completion log reviewed at handover
Step 04

Review the Completion Log

After each booked phase, we record the areas cleaned and deficiencies noticed during the work. Your project team can use that record for its walkthrough and handover file.

You can book one phase or all three. Our guide to rough, final and touch-up cleaning explains what changes between visits.

Timing

When Should You Book Professional Post-Construction Cleaning?

What is happening on site?Cleaning to discussWhy the timing matters
Major trades have finished, but finishing work continuesRough cleanClears initial debris without treating the site as ready for occupancy
Sanding, cutting and other dusty work has endedFinal cleanDetailed surfaces are less likely to be covered by new construction dust
PDI, tenant move-in or opening is approachingTouch-upCatches resettled dust and marks from last-minute work
An office or condo renovation has just finishedFinal clean, with touch-up if neededThe scope can be scaled to one suite instead of a full new-build sequence
A handover date is fixed but trades are still returningPhased planCleaning visits can be placed around the remaining work

Don’t wait until the day before handover to decide which visit you need. Send us the trade schedule and target date, and we’ll scope the cleaning around them.

Plan Your Site Clean
Renovations Too

Post-Renovation Cleaning for Toronto Offices, Condos and Homes

A renovation can leave fine dust beyond the area where the contractor worked. It settles along trim, inside cabinets, on stair rails and around accessible vent covers. Newly installed glass and fixtures may still have labels, protective film or adhesive residue.

Our post-renovation cleaning in Toronto uses the same scope-first approach as a new-build clean. A renovated condo unit, house or small office often needs one detailed final visit. A larger remodel with trades returning to the site may call for separate rough, final and touch-up visits.

If a renovated unit is changing tenants, ask us to assess the work alongside our move-out and turnover cleaning service.

Get a renovation cleaning quote
Post renovation cleaning finished in a Toronto condo suite
One Visit or Full SequenceScoped to the job
✓ Suite to
Whole Site
Across Toronto and the GTA

Areas We Serve

Profound Cleaning serves Downtown Toronto, Midtown, East York, Etobicoke, Scarborough and North York, along with projects across the GTA.

Location affects the work plan. Downtown condo towers may require a reserved freight elevator and loading-dock slot. Occupied office buildings can limit noisy work to evenings or weekends. Houses, retail plazas and industrial units bring different floor types, access points and equipment needs. We ask about those conditions before scheduling the crew.

For location-specific service information, see our pages for North York, Mississauga, Markham and Thornhill.

Post-construction cleaning crew on a Toronto project

Toronto Areas

Downtown Toronto
Midtown
East York
Etobicoke
Scarborough
North York
On Site

Common Post-Construction Cleaning Problems We Solve

Fine dust that keeps returning.

Dust left on upper surfaces, frames and tracks can settle onto cleaned floors. We detail the accessible areas in the agreed scope and time the final visit after dust-producing work ends.

Labels, film and adhesive on new materials.

These residues need to be assessed before removal. The wrong tool or product can mark glass, counters or finished floors.

Grout haze and marked floors.

A floor may need more than a routine mop, but it may not need restoration. We assess the surface and state the proposed treatment in the quote.

Last-minute trade visits.

A plumber, painter or installer can leave marks after the main clean. A touch-up visit close to handover addresses that work without repeating every task from the final clean.

Access delays.

Crews cannot clean a floor they cannot reach. We account for contractor sign-in, loading, elevators, permitted hours and occupied areas when planning the job.

Methods

Professional Equipment and Surface-Specific Methods

The equipment follows the condition of the site. HEPA-filtered vacuuming helps collect fine dust from accessible areas. Floor machines can address suitable tile, VCT and concrete surfaces across larger spaces. Detail tools and products are selected for glass, fixtures, cabinetry and newly finished materials.

A machine isn’t the answer to every mark. Coated glass, hardwood, stone and fresh finishes may need a gentler method or a separate specialist assessment. Our crew reviews the surface before treating stubborn residue. Product safety data sheets are available for site requirements.

Planning Ranges

Post-Construction Cleaning Prices in Toronto

We quote after assessing the job. These published ranges can help you plan a budget, but the written quote reflects the site’s condition and the phases you choose.

Phase 1

Rough Clean

$0.10-$0.20 per sq ft
Phase 2

Final Clean

$0.25-$0.50 per sq ft
Phase 3

Touch-Up

$0.10-$0.15 per sq ft

The minimum job price is $350. Debris volume, glass and floor condition, site access, after-hours work and a short handover window can change the quote.

For a worked example, a 2,000 sq ft office fit-out with a final-clean scope priced at $0.30-$0.50 per sq ft would cost $600-$1,000. That example falls within the wider final-clean range; it isn’t a quote for a site we haven’t assessed.

Get Your Written Quote
Questions

FAQs About Post-Construction Cleaning in Toronto

  • The agreed scope may include loose debris, fine dust on accessible surfaces, cabinet interiors, interior glass, fixtures, washrooms, kitchens and floors. Your written quote lists the tasks and identifies separately priced work.

  • Our planning ranges are $0.10-$0.20 per sq ft for a rough clean, $0.25-$0.50 for a final clean and $0.10-$0.15 for a touch-up, with a $350 minimum job price. Site condition, access and scope determine your written quote.

  • Not always. A small renovation may need one final clean. A larger build with ongoing trades and a later PDI may benefit from rough, final and touch-up visits. We quote the phases your project needs.

  • After sanding, cutting and other dust-producing trade work has ended. If trades return afterward, a touch-up may be needed before handover.

  • We clear and stage loose debris from the areas included in the clean. Off-site hauling, demolition waste and bin removal must be discussed and priced separately if required.

  • Accessible vent covers and grilles can be included. Cleaning inside HVAC ductwork is separate. Interior glass can form part of a final clean; exterior or hard-to-access windows need their own assessment.

  • Yes. We handle individual units and smaller fit-outs as well as larger sites. The $350 minimum applies, and the quote reflects the work needed.

  • Yes. Tell us what the building or general contractor requires when requesting a quote. We can provide liability insurance documentation and current WSIB clearance for site access.

Get a Quote

Need Post-Construction Cleaning in Toronto?

Send us the site location, approximate size, current trade status and handover date. We’ll identify the right cleaning phase or sequence and provide a written scope and quote.

✓ Quote in 24 hours ✓ Crews in 48-72 hours ✓ Written scope and quote

Available 24/7 for project enquiries. Site visits and cleaning are scheduled around access requirements and crew availability.

Profound Cleaning crew at work

Request a Written Quote

No obligation  ·  Written scope  ·  24hr response

Written scope Quote in 24 hours WSIB + $5M insured
🔒 Your information is private and secure. Profound Cleaning is WSIB certified and fully insured.

Related services

Working outside Toronto? We run the same three-phase process across the west GTA, with a dedicated page for post-construction cleaning in Mississauga covering Heartland, Airport Corporate Centre, Meadowvale and City Centre.

Working in Thornhill or north York Region? We run the same three-phase clean there, on both the Vaughan and Markham sides: post-renovation cleaning Thornhill.

Building in York Region? Markham runs its own fit-out pattern, especially along the 404 and 407 corridor: post-construction cleaning Markham.

Building in North York? The Yonge corridor and Don Mills run their own fit-out pattern, and North York follows City of Toronto rules rather than York Region: post-construction cleaning North York.

What clients say

Handed over on time, every time

Finding a reliable commercial cleaning partner in the GTA used to be a headache until we switched to Profound Cleaning Inc. What makes them stand out is their consistency, having a dedicated, background-checked crew that actually knows our facility makes all the difference. Their communication is clear, the team is professional, and the written completion logs after every visit give us total peace of mind.

Salman Bashir KhanGoogle review, 5 stars

ProFound Cleaning provided an excellent experience from start to finish! Their team was professional, friendly, and incredibly thorough. You can tell they take pride in their work and pay attention to the details. Highly recommend them to anyone looking for reliable and high-quality cleaning services!

SSS EmergencyGoogle review, 5 stars

Both reviews are published on our Google Business Profile.